• 花季黄色片,花季传媒官网入口,花季传媒黄色版,花季传媒APP下载安装

    Scan code consultation:
    0755-2102 2109
    Service
    Current locations: Home Service Ex CCC certificate
    The basic process of applying for explosion-proof 3C certification for explosion-proof electrical appliances

    SINO Testing Services

    | 2019-12-12|Return

    As we all know, since October 1, 2019, the State Administration for Market Regulation has included explosion-proof electrical products in the scope of mandatory national product certification. This means that all products in the explosion-proof electrical product catalog must apply for national 3C certification. So, as a manufacturer of explosion-proof electrical products, how should we apply for explosion-proof 3C certification?

    In fact, the application process for explosion-proof electrical 3C certification is the same as that for ordinary 3C certification. The basic process for applying for explosion-proof electrical 3C certification is as follows.

    1、 Application process

    1Submit an application for explosion-proof electrical 3C certification online. The submitted materials include:

    (1) Certification application form or certification service agreement (should be signed);

    (2) Registration certificates of the certification client, producer, and production enterprise (such as business license, administrative license statement, etc.);

    (3) Product description, mainly including: technical parameters, structure, model description, list of key components and materials, explanation of differences between products of different specifications included in the same certification unit, etc;

    (4) Technical documents mainly include: product standards (or technical conditions), instructions, product drawings related to explosion-proof performance, etc;

    (5) Certificate of conformity, factory inspection report, etc. of the test samples;

    (6) Production Enterprise Information Form (when factory inspection is required);

    (7) ODM mode: Provide corresponding information, such as ODM agreement, as required in CQM02-C1 "Supplementary Rules for ODM Mode in CCC Certification".

    (8) OEM mode: OEM agreement, etc.

    (9) For change requests, supporting documents for the relevant change items;

    (10) Other required documents.

    2The issuing authority reviews the application materials

    The issuing authority generally reviews the application materials within 2 working days

    3Laboratory testing

    After the certification authority approves the materials, arrange testing tasks to the laboratory within 2 working days,

    Laboratory selection: optional/specified

    Sample submission requirements: Submit samples according to the laboratory's requirements

    4Test cycle

    Time limit: Generally, the test report should be issued within 30 working days after confirming the receipt of the sample, depending on the complete information provided by the customer and the explosion-proof type applied for. If there are any rectifications during the testing process, the rectification time will not be included. If it is a composite or complex testing project with a long cycle, the testing time will be extended accordingly.

    5Provide a test report

    (1) Test non-compliance must be rectified within 3 months

    (2) If the report is not issued for 12 months due to customer reasons after issuance, the report becomes invalid.

    6Initial factory inspection

    (1) Generally, an initial factory inspection is scheduled within three working days after the completion of the type test.

    (2) Audit 2-3 person days, calculated based on the number of units and relevant personnel of the enterprise.

    (3) Audit basis: Factory quality assurance capability and product consistency.

    (4) The rectification of non conformities in factory inspections must be completed within 40 days.

    (5) The factory inspection results will be reviewed and completed within 5 working days

    7Certificate issuance

    The issuing authority conducts 5 work audits after submitting the type test and factory inspection reports, and issues a certificate after passing the audit.

    2、 Application fee

    The cost of explosion-proof electrical 3C certification includes application fees, certificate fees, testing fees, and factory inspection fees.
    Service Hotline: 18924609560 (same WeChat account)

    Related Recommendations
    Contact us
    0755-2102 2109
    Add: 13F, Building C, Kangjia Guangming Technology Center, No. 288 Xingxin Road, Guangming District, Shenzhen
    Follow us
    Copyright: Shenzhen Zhongnuo Testing Technology Co., Ltd. 粤ICP备96654002号
    Service Hotline
    18924609560
    点击这里给我发消息 1354407946
    点击这里给我发消息 1354407946
    网站地图